This will be a formal review of the UChicago Argonne, LLC (UC-A) Earned Value Management System (EVMS) implemented at Argonne National Laboratory (Argonne).  Discussions and interviews will be performed to assess how the EVM System works and its implementation across all of Argonne (accounting, procurement, software tools and interfaces, scheduling, cost estimating, reporting, Control Account Managers (CAMs), work authorization, etc).  The outcome of this review will be a formal assessment of the UC-A EVM System by an external, independent review team.  This assessment will include corrective actions and continuous improvements.

Starts
Ends
America/Chicago
APS-U2.03.03.04 Vacuum System **New**
APS-U DOE CD-0 Approval Letter
APS-U DOE CD-1 Approval Letter
APS-U DOE CD-1R Approval Letter
APS-U DOE CD-2 Approval Letter
APS-U DOE CD-3A Approval Letter
APS-U DOE CD-3 Approval Letter
APS-U DOE CD-3B Approval Letter
APS-U Organization Chart
APS-U PEP **New**
APS-U RAM - April 2021
APS-U RAM - June 2021
APS-U RAM - May 2021
APSU WBS
APSU WBS (Excel Format) **New**
APS-U Work Authorization Documents
ECDC Approved PEP with Updated Appendix A
ECDC CD-0 Approval
ECDC CD-1-3A Approval
ECDC CD-2 Approval
ECDC CD-3 Approval
ECDC GC Schedule Integration to Baseline
ECDC Org Chart
ECDC Responsibility Assignment Matrix - May 2021 **NEW**
ECDC Responsibilty Assignment Matrix - April 2021 **NEW***
ECDC Responsibilty Assignment Matrix (RAM)
ECDC WBS (Excel Format) **New**
ECDC Work Authorization Documents
ECDC Work Breakdown Structure (WBS)
APS-U2 Baseline (P6)
APS-U2-B (P6) v15.1 **New**
APS-U2 General Assumptions
APS-U2 Risk Management Plan
APS-U2-S (P6) v15.1 **New**
APS-U2 Status (P6)
APS-U Cost Baseline
APS-U Milestone Dictionary
APSU Monthly Schedule Print - April 2021
APSU Monthly Schedule Print - June 2021
APSU Monthly Schedule Print - May 2021
APS-U OPC vs TEC ***new***
APSU Risk Register
APS-U Schedule Critical Path **New**
APS-U Schedule Near Critical Path **New**
APS-U (Status) Fuse - June 2021 **New**
APS-U WBS Dictionary **New**
ECDC April Baseline (P6)
ECDC April CP_Schedule
ECDC April Near CP_Schedule
ECDC April Schedule
ECDC April Status (P6)
ECDC Basis of Estimate Cost Book
ECDC Bottom Up Cost Estimate
ECDC June Baseline (P6)
ECDC June CP_Schedule
ECDC June Near CP_Schedule
ECDC June Schedule
ECDC June Status (P6)
ECDC May CP_Schedule
ECDC May Near CP_Schedule
ECDC May Schedule
ECDC May Status (P6)
ECDC Planning Assumptions
ECDC Risk Management Plan
ECDC Risk Register
ECDC (Status) Fuse - June 2021 **New**
ECDC WBS Dictionary
APS-U2 CPR - April 2021
APS-U2 CPR - June 2021 **NEW**
APS-U2 CPR - May 2021
APS-U2 Month End - April 2021
APS-U2 Month End - June 2021
APS-U2 Month End - May 2021
APS-U2 Monthly Report
APS-U2 Monthy Report - April 2021
APS-U2 Monthy Report - May 2021
APS-U2 Schedule Report (F9 Report)_June 2021 **New**
APS-U April Status Request and Monthly Cycle Dates **New**
APS-U Corrective Action Log
APS-U Histogram, CPI, SPI - April 2021
APS-U Histogram, CPI, SPI - June 2021
APS-U Histogram, CPI, SPI - May 2021
APS-U June Status Request and Monthly Cycle Dates **New**
APS-U May Status Request and Monthly Cycle Dates **New**
APS-U Threshold Letter
APS-U VAR April 2021
APS-U VAR June 2021
APS-U VAR May 2021
APS-U VAR Time Stamp Example **New**
APS-U VAR Time Stamp Example **New**
APS-U VAR Time Stamp Example **New**
APS-U VAR Time Stamp Example **New**
APS-U VAR Time Stamp Example **New**
APS-U VAR Time Stamp Example **New**
ECDC CA Variance Memo
ECDC Corrective Action Log
ECDC EVMS Thresholds
ECDC GC Calendar **New**
ECDC JC Variance Analysis_Xink_Approval - April 2021
ECDC JC Variance Analysis_Xink_Approval - June 2021
ECDC JC Variance Analysis_Xink_Approval - May 2021
ECDC_JUNE_21 Status Update with ETCs **New**
ECDC L2 Variance Analysis_Xink_Approval - April 2021
ECDC L2 Variance Analysis_Xink_Approval - June 2021
ECDC L2 Variance Analysis_Xink_Approval - May 2021
ECDC Month End - April 2021
ECDC Month End - June 2021
ECDC Month End - May 2021
ECDC Monthly Project Cycle Calendar Sample **New**
ECDC PH Variance Analysis_Xink_Approval - April 2021
ECDC PH Variance Analysis_Xink_Approval - June 2021
ECDC PH Variance Analysis_Xink_Approval - May 2021
ECDC Schedule Report (F9 Report)_June 2021 **New**
ECDC Schedule Update Pay App8 R0 06.18.21 ***NEW***
ECDC SLI Monthly Report - April 2021
ECDC SLI Monthly Report - June 2021
ECDC SLI Monthly Report - May 2021
ECDC Variance Analysis - April 2021
ECDC Variance Analysis - June 2021
ECDC Variance Analysis - May 2021